Project: 10 kW solar hybrid station in the center of Bishkek.

pic
pic
pic
pic
pic
pic
pic

The project's distinctiveness stems from the installation of a solar station designed to cut down on the overall electricity usage from the central grid. The station operates without a battery pack, drawing any insufficient power during morning and evening hours from the shared network. Additionally, smart hybrid inverters have the ability to feed excess solar-generated electricity back into the grid. This feature will be enabled once a mining permit is secured. Such measures are expected to diminish the total draw from the grid and yield significant savings.

Equipment list:

  • Photovoltaic modules New-Tek NTE 300-60M (300w) - 20 pcs.
  • InfiniSolar 5 kW hybrid inverter - 2 pcs.
  • Roof mounting set